Little Saskatchewan – First Nation.
Video training 2019
Location: Little Saskatchewan First Nation.
Videography: Kevin Klymchuk
Systems: Full WTP
Status: Ongoing
RO System
Overview of the Reverse Osmosis system
RO Motor Control Panel
Operation and maintenance of the RO Motor Control Panel
Electrically Actuated Valve
Manually opening and closing.
Pressure Relief Sustaining Valve
Operating and maintenance of Pressure Relief Sustaining Valve
PH Calibration
PH Calibration with Delco Water
Variable Frequency Drives
Location and basic knowledge of VFD’s
Civil Water and Sewage Project
Instruments and Control Testing
Handheld Instruments Standards
Thermostatic Mixing Valve
Operating and maintenance.
Replacing Pre Filters
Removal and replacement of pre filters (Shelco).
Distribution Pumps
Operation and maintenance of distribution pumps
Raw Water Turbidity
Raw water turbidity meter and components